VIA Technologies EPIA SN-Series Specifications Page 69

  • Download
  • Add to my manuals
  • Print
  • Page
    / 144
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 68
FASTER Engineering Model
57
Chapter 6. FASTER Engineering Model
As seen in the previous chapter, the FASTER EM includes three main parts:
The Ground Segment infrastructure
The Airborne internal management and computing segment
The Airborne external POD, equipped with the sensing devices
In this section a complete description of the internal management and computing
segment, which is the most important and crucial part of the entire FASTER EM system
will be given, describing how the functional requirements, presented in Chapter 4, were
met in the development of the FASTER Engineering Model. In Table 6 functional
requirements are again presented and for each of them their relative status of
implementation reached in the EM (I= Implemented; PI=Partially Implemented, NI=Not
implemented).
name
Requirements
EM
Implementation
Functional Requirements
RE.F.01
The system shall have the capability to acquire
high resolution Earth images over a large portion
of the electromagnetic spectrum (ranging from
visible to the thermal infrared interval, 0.3 µm <
λ < 14 µm)
PI
RE.F.02
The system shall be able to control and acquire
more than one sensing device using different
hardware interfaces
PI
RE.F.03
Given the target area, the system shall be able to
generate an appropriate trajectory starting from
the departure aerodrome to last selected waypoint
I
RE.F.04
The system shall be able to guide the pilot
through the previously planned flight
I
RE.F.05
The system shall be able to acquire images of the
selected area only; the system shall be able to
know its position with respect to the target area
PI
Page view 68
1 2 ... 64 65 66 67 68 69 70 71 72 73 74 ... 143 144

Comments to this Manuals

No comments