Results of the test campaigns
110
The camera arm switch, for the three campaigns, has been controlled by an operator
which had the role of controlling the system functioning and intervene in case of need.
The aircraft fully equipped is shown in Figure 92.
7.2.1 First Test Campaign
During the very first test campaign most of the flight-time was devoted to understand
how to mount the two units, inside the airplane, in a fully secure way; this allowed to
reduce the installation time for the following two campaigns to only 30 minutes. At that
time the tunnel in the sky interface was still in its first release and no fixing ring was used
to block the focus ring on the camera lens.
Because the objectives of the first test campaign were relative to the installation of
the system on the aircraft, the flight was not planned using the FASTER planner tool but
the trajectory was generated selecting several waypoints on Google Earth, giving the
guidance tunnel the role to built the whole trajectory interpolating the waypoints. The
poor resolution of the first release of the guidance tunnel did not allow the pilot to see the
numerical values indicating the ground speed and the flight altitude, so the pilot had to
continuously move his look between the FASTER monitor and conventional instruments.
Figure 93: First flight campaign trajectory